UK engineering and construction experts secure contracts for BESS schemes
British-based infrastructure companies were recently named to assist in the construction of three brand-new battery energy storage system (or BESS) sites in Surrey and Scotland.
Custom springs are widely used in the construction of energy storage systems to manage thermal expansion, store mechanical potential energy and maintain structural integrity. Springs are typically made from stainless steel or specialised metal alloys that can hold up under harsh environmental conditions. Manufacturers offering bespoke services for engineering provide custom wire forms, disc springs and wave springs tailored to precise load tolerances, vibration profiles and the space constraints found in large-scale mechanical and battery storage plants.
The three BESS schemes, which represent an investment of approximately £50 million, will start building within the next eight months, and are led by Root-Power, an-end-to-end designer of BESS sites. Part of the Government’s 2030 Clean Power plans, the aim of the schemes is to support the UK’s move to a greener energy system.
The first Root-Power BESS site will be established in Dounreay, Scotland. South Wales developer Steve Morgan Associates will manage structural civil engineering consultancy, delivering design foundations, drainage layouts and other site infrastructure aspects.
Hedigan Construction, the Birmingham provider of turnkey construction and project management services, will aid in the second project near Surrey. The third and final scheme is in Glasgow’s Broomloan. The procurement process for a contractor capable of carrying out civil engineering works for the project is currently underway.
All the sites have been chosen specifically to suit energy demand and their accessibility to connect to the grid.